Development of inclinometric monitoring system of Salaj CMID, in place for verifying the soil stability during construction works, and the development of the monitoring process

Development of inclinometric monitoring system of Salaj CMID, in place for verifying the soil stability during construction works, and the development of the monitoring process

{"autoplay":"true","autoplay_speed":3000,"speed":300,"arrows":"true","dots":"true"}

Performed works

An inclinometric monitoring system has been developed, consisting of 6 installations, with depths as low as 14 m. The site is monitored by conducting 80 reading campaigns, at different paces. The program has been launched in 2013 and continues even today (2016)

Latest news:


  • Hidroconstrucția S.A. – Ardeal Branch
  • The company originates from the “General Directorate of Bicaz Hydroelectric Power Plant” that was established in 1950, and subsequently reorganized several times, and in the end received its current name in 1990. The company has as main field of activity the performance of hydro-energetic and hydro-technical constructions both at surface as well as in the underground. To date, the company has built 172 dams, out of which 144 being concrete dams at elevations as high as 168 m

  • Development of inclinometric monitoring system of Salaj CMID, in place for verifying the soil stability during construction works, and the development of the monitoring process
  • Location:
    Commune of Dobrin, Sălaj County, România
  • Timeframe:
    2013 – to date